Model:
T851
Full Automatic Plane Production Line Labeling Head
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Can be matched to the assembly line, labeling on upper plane and side when products pass, can achieve online labeling, such as matching inkjet machine together, for passing products to achieve labeling and spraying printing at the same time.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 40~120pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | 10~150mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 885×870×1535mm |
| Machine Weight | 76kg |
| Air Pressure Requirements | N/A |
Product Features
Production Line Integration
Seamless integration with existing workshop assembly lines for continuous production flow
Online Labeling Capability
Real-time online labeling capability as products pass through the production line
Multi-Position Labeling
Capable of labeling on both upper plane and side positions during single pass operation
Inkjet Integration
Compatible with inkjet machine integration for simultaneous labeling and printing operations
Optional Accessories
Accessory Name
Function Description
Assembly Line Interface
Standard interface connections for integration with various assembly line conveyor systems
Inkjet Machine Connection
Inkjet machine connection capability for simultaneous labeling and content printing operations
Technical Documentation
Product Series
Label Applicator Heads
Modular labeling heads for production line integration and custom automation solutions designed for OEMs and system integrators
Learn More
Automation Level:
Fully Automatic