Model:
T831
Full Automatic Plane Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for on the plane of various products labeling and adhesive sticker film, such as book, folder, box, carton, etc. Modifying the labeling head, can be used for labeling on uneven surface, widely apply for the plane labeling of large and wide range of specifications products.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1mm |
| Labeling Speed | 40~80pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | 0.5~150mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 1925×735×1360mm |
| Machine Weight | 188.5kg |
| Air Pressure Requirements | N/A |
Product Features
Wide Product Range
Compatible with books, folders, boxes, cartons and various flat products with extensive size range
High-Speed Processing
High-speed operation processing 40-80 pieces per minute for efficient production throughput
Large Format Capability
Accommodates large products (up to 400mm length) and wide specification ranges for versatile applications
Flexible Surface Handling
Modified labeling head capability for uneven surface applications and adhesive sticker film application
Optional Accessories
Accessory Name
Function Description
Conveyor Belt System
High-speed conveyor belt system for smooth product transport and positioning
Coding Machine Interface
Optional ribbon coding machine and inkjet printer interface for production information printing
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic