Model:
T832
Full Automatic Page Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for all kinds of cards/small cartons/scratch cards/PE bags labeling with high precision and no bubbles.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1mm |
| Labeling Speed | 40~120pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | 0.2~5mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 2445×735×1360mm |
| Machine Weight | 224kg |
| Air Pressure Requirements | N/A |
Product Features
High Precision Card Labeling
Specialized for cards, small cartons, scratch cards, and PE bags with precision handling
Bubble-Free Application
Advanced bubble-free labeling technology ensures perfect application without air pockets
Small Product Handling
Designed specifically for handling very thin products (0.2-5mm) with delicate precision control
High-Speed Processing
High-speed operation capability up to 120 pieces per minute for maximum throughput
Optional Accessories
Accessory Name
Function Description
Card Feeding System
Precision card feeding mechanism for accurate positioning and handling of thin materials
Anti-Static Equipment
Anti-static system prevents static buildup during high-speed operation with sensitive materials
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic