Model:
T823
Full Automatic Horizontal Round Bottle Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for wrap around labeling on cylindrical object that can not stand up, horizontally conveying and labeling improve stability and labeling efficiency. Optional ribbon coding machine and hot stamp printer or inkjet printer can be added.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1mm |
| Labeling Speed | 15~30pcs/min |
| Bottle Diameter Range | φ10~φ30mm |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 2020×735×1425mm |
| Machine Weight | 220kg |
| Air Pressure Requirements | N/A |
Product Features
Horizontal Conveying System
Horizontal transport system specifically designed for products that cannot stand vertically
Unstable Product Handling
Specialized handling mechanism for unstable or rolling cylindrical objects and small diameter bottles
Improved Stability
Enhanced stability through secure horizontal positioning during the entire labeling process
Continuous Operation
Continuous operation capability with integrated conveyor system for uninterrupted production flow
Optional Accessories
Accessory Name
Function Description
Horizontal Conveyor System
Specialized horizontal conveyor belt system for smooth and stable product transport
Inkjet Printer Interface
Optional inkjet printer connection to conveyor belt for pre/post labeling printing of dates, codes, and barcodes
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic