Model:
T853
Full Automatic Gantry Stand Labeling Head
Professional labeling solutions for enhanced production efficiency
Learn More
Main Applications
Can be matched to the assembly line, labeling on upper plane and arc surface when products pass, to achieve automation labeling, such as matching to inkjet machine conveyor belt, for passing products to achieve labeling.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | Step: 40~150pcs/min, Servo: 50~200pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 1230×797×845mm |
| Machine Weight | 66kg |
| Air Pressure Requirements | N/A |
Product Features
Gantry Stand Design
Overhead gantry stand design for flexible positioning over production lines without obstruction
Arc Surface Capability
Specialized capability for labeling on both upper plane and curved arc surfaces
Automation Integration
Full automation integration for unmanned labeling operations in production environments
Dual Motor Options
Dual motor system options: Step motor (40-150pcs/min) or Servo motor (50-200pcs/min) for different speed requirements
Optional Accessories
Accessory Name
Function Description
Gantry Mounting System
Heavy-duty gantry mounting system for stable overhead positioning and operation
Automation Interface
Complete automation interface for integration with production line control systems and inkjet equipment
Technical Documentation
Product Series
Label Applicator Heads
Modular labeling heads for production line integration and custom automation solutions designed for OEMs and system integrators
Learn More
Automation Level:
Fully Automatic