Model:
T962
Full Automatic Double Sides Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Suitable for single side and double sides labeling of flat bottle, round bottle and square bottle, such as shampoo flat bottle, lubricating oil flat bottle, hand sanitizer round bottle etc double sides labeling, both double sides labeling at the same time, greatly improve production efficiency.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | Step: 30~160pcs/min, Servo: 50~200pcs/min |
| Bottle Diameter Range | 30~90mm |
| Bottle Height Range | 60~280mm |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 3070×1410×1565mm |
| Machine Weight | 473kg |
| Air Pressure Requirements | N/A |
Product Features
Simultaneous Double Labeling
Simultaneous double-sided labeling capability for maximum efficiency and reduced processing time
Enhanced Productivity
Greatly improved production efficiency through dual-label application in single pass operation
Heavy-Duty Design
Ultra-heavy-duty construction (473kg) engineered for high-volume continuous production environments
Flexible Configuration
Flexible configuration for both single side and double sides labeling based on production requirements
Optional Accessories
Accessory Name
Function Description
Dual Labeling System
Independent dual labeling systems for synchronized front and back label application
Production Control Panel
Advanced production control panel with programmable settings for various bottle configurations and labeling patterns
Technical Documentation
Product Series
Bottle Labelers
Professional bottle labeling machines for round bottles, flat bottles, and specialty containers across beverage, pharmaceutical, cosmetic, and industrial applications
Learn More
Automation Level:
Fully Automatic