Model:
T-Carton
Full Automatic Carton Box Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Main Applications
Specially research and development labeling machine model for carton labeling, suitable for on the upper and under plane of various cartons labeling and adhesive sticker film. Available in single head, double heads, and three heads configurations.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 20~50pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | Custom Dimensions |
| Machine Weight | 200kg |
| Air Pressure Requirements | N/A |
Product Features
Multi-Head Configurations
Available in single head, double heads, and three heads configurations for different production requirements
PLC Control System
Advanced PLC control system with sensor detection and automatic label application
Automatic Process
Fully automatic process: product detection → conveying → correction → labeling → collection
Carton Specialization
Specialized design exclusively for carton box labeling with customized dimensions based on requirements
Optional Accessories
Accessory Name
Function Description
Multi-Head Options
Choice of single, double, or triple labeling heads based on production volume and carton size requirements
PLC Control System
Advanced PLC control system with programmable logic for various carton handling and labeling sequences
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic