Model:
T-Bottom
Full Automatic Bottom Labeling Machine
Professional labeling solutions for enhanced production efficiency
Learn More
Product Images
Main Applications
Specially research and development labeling machine model for bottom or under plane of products labeling, suitable for on various of the under plane labeling and adhesive sticker film.
Key Features
This advanced labeling machine offers precision, reliability, and efficiency for various industrial applications.
Technical Specifications
| Parameter | Specification |
|---|---|
| Labeling Accuracy | ±1.0mm |
| Labeling Speed | 20~50pcs/min |
| Bottle Diameter Range | N/A |
| Bottle Height Range | N/A |
| Power Requirements | 220V/50HZ&110V/60HZ |
| Machine Dimensions | 2335×850×1310mm |
| Machine Weight | 200kg |
| Air Pressure Requirements | N/A |
Product Features
Bottom Surface Labeling
Specialized bottom surface labeling capability for products requiring under-plane label application
Specialized Design
Purpose-built design exclusively for bottom labeling applications with inverted labeling mechanism
PLC Control
Advanced PLC control system managing inverted product handling and precise label placement
Custom Configuration
Custom configuration available based on specific product dimensions and labeling requirements
Optional Accessories
Accessory Name
Function Description
Inverted Handling System
Specialized inverted product handling system for secure bottom surface access during labeling
Custom Fixtures
Custom fixtures designed for specific product dimensions and bottom labeling requirements
Technical Documentation
Product Series
Box & Carton Labelers
Specialized labeling equipment for boxes, cartons, and packaging materials with superior handling capabilities for e-commerce, retail, and industrial packaging
Learn More
Automation Level:
Fully Automatic